
Scheme report · PDF
Post-construction scheme report
My report on the engineering behind the scheme: adapting the Dutch design for UK roads, the non-standard signs and road markings, drone surveying, early contractor involvement and how the junction was received after opening.
Download the report (PDF, 1.7 MB) ↗


